Toowoomba AgShow
REGYP is located at stand 302 at this years Toowoomba AgShow event.
REGYP is located at stand 302 at this years Toowoomba AgShow event.
REGYP is located at stand M38b at this years AqQuip event.
CONTROVERSIAL plans to massively expand an Ipswich dump have been put on hold and its opponents want to stop it for good. Transpacific (TPI) has applied to increase the capacity of the dump at New Chum from 50,000 to 1.9 million tonnes a year. Deputy Mayor Victor Attwood said the application had passed from the
RioTinto has blocked a bid by BGC to win control of its gypsum deposits near Carnarvon WA, by restarting its ancillary operations at the mine. The operations were moth balled when the economics were tight and the salt market became priority.
Support farmers and Australian manufacturers by buying local and non-homebrand goods. Your consumer behaviour effects more than your back pocket. Support Aussie Farmers
A coal seam gas company Metgasco has disposed of over one million litres of dirty salty water to a sewerage treatment plant at Casino that is not licensed to take such a waste. Large volumes of water are drawn up from under ground in most coal seam gas sites as a by-product of the gas extraction process.
After some post sowing rain and buoyant pricing forecasts for canola the season looks promising. Bullish forecasts of $555/t (Port Adelaide) have been published. Canola sowing in the central and south west NSW areas prominent. DPI forecasted planting for canola in April 548,000 ha and May 668,500 ha. Other crop forecasts where: Wheat April 3.05m ha, May
Mined gypsum in Australia can come in many forms with varying quality. The most pure gypsum is generally mined near Ceduna in South Australia and Dampier in WA. Other regional gypsum mines can produce sub standard gypsum, so when comparing any gypsum products including recycled gypsum, you must look at the purity and the sulphur
The Murray-Darling Basin Authority has not changed the recommendation to return 2750 gigalitres of water to the river system, under its revised plan. The Murray-Darling Basin Authority (MDBA) is standing by a recommendation to return 2750 gigalitres of water a year to the river system, under a revised plan sent to federal and state government
Industry news is that Sibelco (old unimin) have bought the Galong lime operations from Boral. History: The Galong deposit was first mined in 1885 with significant mining activity in the 1920s producing quicklime, which is used in the production of cement. The mine re-opened in the 1960s and again in 1994. In 2001, the